Order sheetNo. 2026-014
ExampleProject
A website for a joinery workshop
Your turn: 2 things
I’m waiting for your materials. As soon as you send them, I’ll start on the design.
Nothing is sent in the example.
What I need from you
Send the text about the workshop and its services
Without the text I can’t design the Services and About us pages.
Due 21 Nov
Choose 10 photos of finished work
The photos decide how the home page will look.
Due 21 Nov
If it comes later, the launch moves by as many days as I wait.
Project steps
- 1.Inquiry receivedDone 3 Nov
- 2.BriefDone 7 Nov
- 3.ProposalDone 10 Nov
- 4.Contract and depositDone 13 Nov
- 5.Materials and accessWhose turn: youIn progress, 14 Nov to 21 Nov
- 6.DesignWhose turn: me22 Nov to 27 Nov
- 7.BuildWhose turn: me28 Nov to 7 Dec
- 8.Review and testingWhose turn: you8 Dec to 12 Dec
- 9.Launch and handoverWhose turn: me13 Dec to 15 Dec
What happens next
Once I have your materials, I’ll prepare the design.
Price
€2,400
Fixed price
What you get at handover
- The code repository
- Access to the domain and hosting
- Documentation for running the website
History
- The contract is signed and the deposit has arrived. Thank you.
- I sent the proposal with the scope and dates.
- We wrote the brief: the website should bring in inquiries for custom-made furniture.
- Inquiry received.